Pools, spas & saunas.
Factory price.
Made to order in our own factory and sold direct to hotels, resorts and homes.
Made in our factory.
Priced from it.
Every model is built to your size, shape and finish. Tap a product for its factory price.
Seven ways
into the water.
Everything
behind the water.
Built for resorts
people return to.
Our factory · BeijingNo middlemen.
Just our workshop.
Laser cutting, CNC bending, TIG welding and polishing under one roof — the same team that designs your pool cuts its first sheet. That is why our price is a factory price.



From first sketch
to first guest.
One contract, one team, one point of contact — from the water analysis to the after-sales service desk.
- 01Brief & water testYour site, use and source-water report decide the design and the steel grade.
- 02Design & drawingsConcept, 3D model and engineering drawings for your approval.
- 03Factory buildCut, formed, welded, polished and pressure-tested in our own workshop.
- 04Install & commissionGuided or turnkey installation, five commissioning records, operator training.
- 05After-salesP1–P4 response times, spare parts in 15 working days, 8-year parts availability.
Made in one factory.
Working worldwide.
One factory, one team, delivering to hotels, resorts and homes wherever the water is.
- BeijingFactory & head office
- SwedenStavsjö hot spring hotel, since 2009
- CanadaProject delivered
- USAProject in progress
- New ZealandProject in progress

Design portfolio
Our design team plans the whole bathing experience — master plan, landscape, interiors, pools and the equipment behind them. Renderings from recent design proposals.
Designed by us.
Built by us.
The pools, spas and plant rooms in our designs come from our own factory — so the drawing you approve is the product you receive.

Projects
Hot springs, hotels and resorts — from the plant room to the pool hall. Real footage and photographs from our sites.
Seven projects,
one standard.
Wellness hotels, resort towns, rooftop terraces and show venues across China — each with the scale, location and our scope set out below.
Linhai Yitang Wellness Hotel,
Arxan, Inner Mongolia
A five-star wellness hotel in the primeval forest of the Greater Khingan mountains. Its domed hot spring hall has a curved acrylic-walled pool and hydromassage loungers — and behind the walls, a complete water treatment plant room, built and commissioned by our team. The hotel also has sauna and salt-wall rooms.
| Project | Arxan Linhai Yitang Wellness Hotel |
|---|---|
| Location | Phase II, Dongguli Xuecun, Wenquan Subdistrict, Arxan, Hinggan League, Inner Mongolia |
| Resort | 156 five-star wellness rooms · 16 private hot spring courtyards · 4,200 m² hot spring pools incl. a suspended transparent swimming lane and 11 outdoor pools · banquet hall · yurt restaurant · health management centre |
| Type | Indoor hot spring hall and plant room |
| Our scope | Water treatment plant room (filtration, pumps, pipework) · on-site welding · curved acrylic pool walls with stainless channel · hydromassage loungers and neck-massage spouts · PLC control cabinet · commissioning |
Hot spring water,
used step by step.
Spring water arrives at 60–70 °C. We use it in stages — domestic hot water, pool heating, floor heating, then heat pumps — before it is returned or reused, cutting heating cost by about half.
Trusted since 2002.
More than 100 completed or ongoing hot spring, spa and pool projects. More case studies are being added.
Gubei Water Town · Jiuhua Resort · BBMG Jinyu · Wanda · Sunac · Evergrande · Fosun · Tongrentang · Nangong Hot Spring Water World — and long-term partner to Wanda Culture & Tourism, Wanda Hotels, Fosun Tourism, Sunac Culture & Tourism, Evergrande Children's World and OCT.
Seventy projects
and counting.
Hot spring hotels, geothermal energy systems, spas, pools, water parks and water features across China and in Sweden. Search or filter the list.

Factory & Engineering
Real photographs from our workshop and our sites — how a STAVSJÖ pool is drawn, built, delivered and installed.
Laser, press brake,
one roof.
Our production campus in Beijing: a fibre-laser cutting line with its own chiller and compressed-air supply, a bending hall of CNC press brakes and shears, and an automatic-control workshop where control cabinets and stainless enclosures are built and wired.
Built in one piece,
in our own hall.
Panels are cut, formed and TIG-welded on reinforcing frames, then ground, polished and pressure-tested before they leave. See Technology & Materials for the six fabrication steps.
Fourteen steps,
one team.
The same people draw, cut, roll, weld, polish, pack and install. Photographs and clips from recent production in our workshop and on site.
Every pool
is drawn first.
Skimmer or overflow, straight or curved, sunken or rooftop — each project is modelled and detailed before cutting starts. You approve the drawing; we build to it.
Where quality
shows.
Overflow gratings, channels, steps and rails — the parts guests touch every day, photographed on finished pools.
Lifted in.
Not poured.
Because the shell arrives finished, site work is short: a prepared base or pit, a crane, connections and commissioning.
Give an old pool
a steel life.
A leaking concrete pool does not always need demolition. A welded stainless lining can be installed inside the existing structure, ending the cycle of re-tiling and re-waterproofing.
The plant room
comes with it.
Filtration, dosing, heating and controls are designed with the pool — as a plant room, an underground shaft or a compact equipment wall — using equipment from ISO-certified suppliers.

Hot spring
technology
Twenty years of geothermal water treatment, cascade heating, dehumidification, immersive spa rooms and smart control — from our technical manual, with every diagram in English and Chinese.
温泉核心技术 · 中英文对照
From the well
to the pool.
Spring water straight from the well often carries sand, iron, manganese, hydrogen sulphide, fluoride or arsenic. Each is removed in its own stage before the water reaches a bather.
Five problem substances,
five methods.
Method chosen from the source-water analysis of each well.
When is spring water
medicinal?
Thresholds in mg/L (radon in Bq/L) at which a component has medical value, and at which the water may be named after it.
Reference values as summarised in our technical manual; the applicable standard is confirmed for each project.
A loop that
never stops.
Every pool runs its own circulation: strained, pumped, filtered, heated and disinfected, then returned — around the clock.
Behind the walls
of a hot spring.
Water treatment plant rooms built by our installation teams: filter batteries, balance tanks, pump sets and pipework — photographed during construction.
One well,
four temperatures.
Spring water gives its heat in steps — hottest uses first, then cooler ones, and finally water-source heat pumps — before it is reinjected at 20 °C or below.
One hotel, three wells,
RMB 8.76 million a year.
From the energy analysis for a hotel project with three geothermal wells. Well 3 delivers 33 °C water at 80 t/h. Using it for about 300 t a day of domestic hot water, instead of heating mains water from 13 °C, saves:
It lifts low-grade heat from shallow groundwater or spent spring water to useful temperatures with a small input of electricity. In heating mode the refrigerant releases heat to the building's heating water in the condenser and picks up heat from the source water in the evaporator; in cooling mode the cycle is reversed and the heat goes into the source water.
Dry air,
driven by spring water.
Pool halls are humid. A liquid-desiccant heat pump removes moisture and odours without over-cooling and reheating the air, and its solution is regenerated with geothermal hot water — no other energy needed.
Bathe inside
a storm.
A turnkey immersive spa room: four LED walls, real rain and wind, lightning and wave jets, all running to the film's timeline. Below, the specification of a public-area room from our manual.
One-stop storm-rain spa room · 一站式构建暴风雨水疗房
Size the plant room to the equipment, and never place equipment above pool level. Leave at least 50 cm around the pool for the LED frame and ventilation. Building drainage and the ceiling finish are by others; detailed pipework drawings follow once the scheme is approved.
Every pool,
on one screen.
Manual pool checks, valve turning and paper logs are slow and costly. Our system monitors and controls supply, pools and plant rooms through sensors and IoT, guides visitor flow, raises alarms and analyses energy use.
Our own
control workshop.
Control cabinets and stainless enclosures for these systems are assembled, wired and tested in our automatic-control factory before they go to site.
Quality & Supply Chain
How we check our own work — and the certified manufacturers and distributors behind the equipment in our systems.
Inspected before
it ships.
| Materials | Mill certificates checked for every batch of stainless steel; grade confirmed against the water analysis (SUS 304 or 316 / 316L). |
|---|---|
| Welds | Visual inspection and dye-penetrant testing; radiographic or ultrasonic testing on critical joints. |
| Surface | Ground, polished and passivated after welding. |
| Dimensions | Verified against the approved drawing before dispatch. |
| On site | Five commissioning records, ending with a signed acceptance and water quality report. |
Our own
inventions.
Utility-model patents held by Yuanwang group companies, covering hot spring pools, water treatment, hydrotherapy, heating and sweat-steam rooms.
Recognised
by the industry.
Certificates held by Yuanwang group companies. Shown as issued; current validity and full copies are available on request.
Equipment from
certified sources.
Water treatment equipment in our systems is sourced from manufacturers and distributors holding the management-system certificates below.
Everything around
the steel.
We build the steel ourselves and work with specialist manufacturers for finishes, lighting, fittings, displays and electronics — so one order covers the whole installation.
Photographs show partner products and samples. Availability, specifications and lead times are confirmed in the quotation.

Built once.
No leaks. No cracks.
How a STAVSJÖ pool is made — and why a welded steel shell outlasts concrete and tile.
The shell is the waterproofing.
Concrete pools rely on a coating or membrane to hold water. Over time it ages and cracks, and a leak usually means breaking out tiles and closing the pool. A STAVSJÖ pool is one fully welded stainless steel vessel: between the water and the structure there is only metal. The non-porous surface does not hold dirt or colour, which cuts chemical use and cleaning time.
Six steps in our factory.
Water first
We test before we design. Chlorides, temperature and treatment chemicals decide the steel grade. For aggressive spring water we offer a steel structure with a dedicated liner.
Precision cutting
Plates are cut by CNC laser or plasma for accurate, clean edges, which are then chamfered.
Forming
Hydraulic press brakes and rollers shape each panel, with bend radii of at least 1.5 × plate thickness to avoid stress cracks.
TIG welding
Full argon-arc welding with matched ER308L / ER316L filler, worked in staged sequences to control distortion. Reinforcing ribs are spaced at no more than 800 mm.
Finishing
Welds are ground and the surface polished in stages (80 / 120 / 240 grit) to a brushed, mirror or matte finish, then passivated.
Inspection
Material certificates checked; welds inspected visually and by dye-penetrant test, with radiographic or ultrasonic testing on critical joints; dimensions verified before dispatch.
Measured,
not assumed.
Key parameters from our technical method statement for stainless steel spa pools, and how each one is checked.
| Parameter | Requirement | Checked by |
|---|---|---|
| Material | SUS 304 / 316L, nickel ≥ 8% | Spectral analysis |
| Plate thickness | Shell ≥ 1.2 mm (1.5–2.0 mm for large pools); stiffeners ≥ 2.0 mm | Ultrasonic thickness gauge |
| Surface | Roughness Ra ≤ 3.2 μm | Roughness tester |
| Stiffness | Ribs at ≤ 800 mm; deflection < 3 mm when full | Load test |
| Corrosion | No rust after 800 h salt-spray test | Salt-spray chamber |
| Base slab | Concrete ≥ C20, ≥ 150 mm, flatness ≤ 3 mm/m | Test cubes, level |
| Setting out | Level within 3 mm/m | Laser level |
| Water-tightness | Filled 24 h (48 h above 100 m³), then observed 24 h: no leaks, level drop ≤ 2 mm | Closed-water test |
| Cutting | Length / width ±1 mm; diagonal ±1.5 mm | Tape, square |
| Rolled curves | Radius within ±2%; roundness ≤ 0.5% of diameter, max 5 mm | Template, gauge |
| Fit to site | Key parts within 3 mm of site measurements; at least 10% trial-fitted, 100% of key parts | Site survey, trial fit |
Design references include GB 50015 (water supply & drainage design), GB 50268 and GB 50235 (pipework construction and acceptance). Project-specific values are confirmed in the quotation.
Runs itself.
Reports to you.
Our control logic for spas, pools and plant rooms runs on PLC controllers with a touch screen on site, a phone app and remote alarms. Typical set-points below; each project is tuned to its water and use.
Steel, concrete or acrylic?
| STAVSJÖ stainless steel | Concrete + tiles | Acrylic shell | |
|---|---|---|---|
| Initial cost | Higher | Low material cost, high labour | Low |
| Build time | Factory pre-made, fast install | Pour, cure, waterproof, tile — about 40–60 days to testing | Fastest — ready-made shell |
| Waterproofing | Fully welded shell, nothing to fail | Coating or membrane that ages and cracks | One-piece shell |
| Yearly upkeep | Low — rinse, check welds | Medium–high — grout, re-waterproofing, patching | Low — but scratches hold dirt |
| Major repair | Long structural life; a liner, where fitted, can be replaced without removing the structure | Waterproofing needs attention after about 5–10 years; leaks mean breaking out | Hard to refurbish; usually replaced |
| End of life | Steel is recyclable | Demolition waste | Replacement |
Over about ten years the total cost of a stainless pool is typically no higher than concrete, because repair and closure costs are avoided.
SUS 304
The standard choice for tap water and typical hot spring water — the balanced starting point for most projects.
SUS 316 / 316L
Stronger resistance to chlorides and sulphides, for seaside sites, high-chlorine water, sulphur springs and heavy commercial use. About 20–30% higher material cost than 304.
After-Sales Service Policy
For overseas customers in the EU / EEA and Great Britain. A summary of how we respond, what we cover and what we ask of you.
We promise a response
Someone answers, someone diagnoses, someone gives you the next step. We do not promise a result before we have seen the facts.
We promise to come — as agreed
A visit from China to Europe takes time. The number of on-site visits and who pays for travel are written into your contract.
Inside the boundary, it is ours
Material, workmanship or design defects that existed when the goods left the factory are our responsibility.
Response times
Times run from the moment we receive complete information. “First response” means we have confirmed receipt and assigned an engineer. “Target” is the time to a technical judgement or plan; it does not include shipping or visa time.
| Level | Situation | First response | Target |
|---|---|---|---|
| P1 Urgent | System fully stopped, leak or flooding, electrical risk, safety affected | Within 2 hours (working hours) Within 8 hours (out of hours) | Temporary measures within 24 hours |
| P2 Major | Main function lost but partly running — e.g. one pump down, temperature control fault, water quality out of range | Within 8 hours | Solution within 3 working days |
| P3 Normal | Local fault, parameter drift, appearance issue | Within 2 working days | Plan within 7 working days |
| P4 Enquiry | How-to questions, spare-part prices, documents | Within 3 working days | Handled as an enquiry |
Warranty
Standard recommended periods, counted from handover and acceptance at the project site. The periods in your contract apply; extended warranty can be agreed separately.
| Component / system | Period | Notes |
|---|---|---|
| Pool shell waterproofing & lining system | 5 years | Parts supplied and installed by Yuanwang; excludes civil structure |
| Buried pipework & water distribution | 3 years | Excludes external damage, frost heave, settlement |
| Heat exchangers | 2 years | Scaling or corrosion from out-of-spec water is not covered |
| Yuanwang-brand equipment — pumps, filters, dosing units, control cabinets | 2 years | Excludes wear parts |
| Heat pumps & geothermal wellhead equipment | 2 years | Annual maintenance required |
| Wellness & hydrotherapy equipment | 1 year | High-frequency commercial use |
| Third-party equipment — valves, instruments, inverters | Maker's terms | We assist with the claim to the original maker |
| Wear parts — seals, O-rings, filter elements, nozzles, lamp covers | 3 months | Normal consumables |
Covered: faults and under-performance caused by material, workmanship or design, under normal use and normal maintenance.
Not covered:
- Installation, operation or maintenance not following the manual
- Water quality outside the agreed design conditions
- Missed scheduled maintenance — the warranty period is then halved
- Damage, misuse or unauthorised modification
- Force majeure
- Normal wear and natural change in appearance
Installation, commissioning & training
Most “after-sales problems” overseas begin at installation. We treat commissioning as the first step of after-sales, and your contract names one of three installation modes.
| Mode | What happens | Best for |
|---|---|---|
| A · Guided installation | Our engineer attends; your team installs; we guide, confirm key steps and commission | Recommended — best value |
| B · Turnkey installation | Our team installs and commissions | Complex systems, no local crew |
| C · Self-install + remote commissioning | We provide drawings, video guidance and remote commissioning; you send photo records | Simple systems, experienced clients |
Five records are always kept — they are the basis for any later question of responsibility:
- Unpacking inspection — appearance, quantity, nameplate data
- Pipe flushing and pressure test
- Electrical wiring check and insulation test
- First filling and first-run parameters
- Commissioning acceptance, including a water quality report
Training: one on-site session of 2–3 working days for your operating staff, covering daily operation, backwashing, dosing, settings and common faults. Operation and maintenance manuals are supplied in English (electronic).
Remote first, on-site as agreed
If it can be solved remotely, we do not send an engineer — a remote answer in 24 hours is better than a visit in a month. Remote diagnosis uses video calls, authorised temporary access to the control system, site photos to our checklist, and operating data.
| On-site visits | What to expect |
|---|---|
| Lead time | Usually 15–30 calendar days from confirmation to arrival, including visa and travel |
| Duration | 5–10 working days recommended per visit |
| Cost | Within warranty: engineer day-rate waived; travel shared as the contract states. Outside warranty: paid by the buyer |
| Number of visits | Written into the contract; extra visits are charged per visit |
| If we cannot attend | Remote diagnosis plus a local service company working under our technical guidance |
Spare parts
- Standard parts — seals, filter elements, nozzles, diaphragms, common electrical parts: shipped within 15 working days of order.
- Non-standard and custom parts: shipped within 45 working days, as quoted.
- After a model is discontinued: key parts remain available for 8 years.
- Quotation: price, lead time and shipping method within 2 working days of your parts order.
We recommend ordering a first-year spare-parts kit with your equipment. A seal worth under 1% of the equipment price can otherwise stop a system for a month.
Maintenance schedule
Standard operating conditions. Scheduled maintenance keeps your warranty at full length.
| Interval | Tasks |
|---|---|
| Daily | Check flow, pressure, temperature, chlorine / ORP and pH; look for noise, leaks and alarms |
| Weekly | Backwash filters; check dosing levels and rates; check pump vibration and temperature |
| Monthly | Full water analysis; clean the control cabinet; re-tighten fasteners |
| Quarterly | Check heat-exchanger and pump efficiency; test safety valves |
| Half-yearly | Electrical insulation test; back up inverter settings; calibrate sensors |
| Yearly | Full system overhaul; assess seals and wear parts; annual system health report |
Claims
Please notify us of a defect within 30 days of finding it, and no later than two years after delivery. We give a written finding within 30 working days of receiving complete documents.
| Value / impact | How it is handled |
|---|---|
| Under €500 | You may fix it first and claim with photos and invoice — no prior approval (up to twice a year) |
| €500 – €5,000 | Remote diagnosis and finding of responsibility; reply usually within 10 working days |
| Over €5,000 or safety-related | Dedicated team, on site if needed |
Raising a service request
Service requests go through the service desk named in your contract, so that every request is numbered and tracked. To start the clock, please include:
- Equipment serial number
- What is happening, and since when
- What has already been tried
- Photos or video
- Current operating values — flow, pressure, temperature, current
- Latest water test record

Born at a Swedish spa.
STAVSJÖ is the stainless steel pool, spa and sauna brand of Beijing Yuanwang Hot Spring Design Group.
Stavsjö,
since 1666.
The crowned deer of Stavsjö — a royal retreat south of Stockholm, and the emblem of our brand.
The Stavsjö hot spring hotel stands south of Stockholm. Founded in 1666, it was once a royal retreat and is known today for its spa. In 2009 our group became its largest shareholder, taking on its operation and its technical and brand development.
That is where the name comes from — and the standard. We bring Nordic spa thinking to every pool we build in our own factory in China, and sell it to you directly.
| 2002 | Beijing Yuanwang Liye Leisure Equipment founded — water treatment for geothermal water, hot springs and pools. |
|---|---|
| 2006 | Beijing Yuanwang BaiLi Landscape Architecture Design founded — hot spring towns, hotels, spas and pools. |
| 2009 | Largest shareholder of the Stavsjö hot spring hotel, Sweden. |
| Today | Over 100 completed or ongoing projects. A design team of more than 50. Utility-model patents covering bathing pools, water treatment and hydrotherapy. |
Beijing
Yuanwang
Where our work lives.
Hot spring, spa and pool settings from our archive. Detailed case studies are coming soon.
Buying from overseas,
made simple.
What international buyers ask us most — prices, lead times, shipping, installation and warranty. If your question is not here, ask us on WhatsApp.
Four steps,
one contact.
You deal with one person from the first message to commissioning — no agents, no hand-offs.
- 01Send your briefA size, a sketch or a photo of the site. WhatsApp or email.Day 1
- 02Quote & drawingsFactory price, specification and drawings for your approval.From 1 working day
- 03Build & inspectMade in our Beijing factory, inspected and documented before it leaves.Confirmed in your quote
- 04Deliver & commissionGuided, turnkey or remote installation, then after-sales support.Modes A · B · C
Prices & quotes
Why are you cheaper than European brands?
We design, cut, weld and polish in our own factory and sell to you directly. There is no importer, distributor or showroom in between, so you pay the factory price for the same stainless steel grades.
How do I get a price?
Send us a size, a sketch or a photo of your site through the quote form, WhatsApp or email. We reply within 1 working day. Drawings and photos help us price faster and more accurately.
Do you sell to my country?
Yes. We work with clients in any country. Our group has projects in China and Sweden and has delivered or is delivering projects in Canada, New Zealand and the USA.
Can I order a single unit?
Yes. Every product is made to order, so one hot tub for a private villa is as welcome as a full hotel spa.
Products & materials
304 or 316L stainless steel — which do I need?
SUS 304 suits most fresh-water pools and hot tubs. For mineral hot spring water, salt water or coastal sites we usually recommend 316L. Send us your source-water report and we will advise. Every shell uses steel with nickel content of at least 8%.
Can you build to my exact size and shape?
Yes. Size, shape, depth, finish, jets and lighting are all made to your specification. Try shapes and finishes in our 3D Design Studio, then send us a screenshot.
How do you check quality?
Welded shells are TIG-welded, dye-penetrant tested and given a 24-hour water-tightness test. See Quality & Supply Chain for the full list of checks.
Are the pictures on this site real?
Most photographs come from our factory and our projects. Some images are design renderings, and they are labelled. Final specifications always follow the approved drawings.
Can I visit the factory?
Yes, by appointment. We are happy to show customers round the production campus in Beijing, or give you a live video tour.
Shipping & installation
How long does production take?
It depends on the size, finish and equipment. Your quotation states the production time and delivery schedule before you order.
How is it shipped?
Products are packed for export in our factory. The delivery terms — to your nearest port or to your site — are agreed and written into your quotation.
Who installs it?
You choose one of three modes. A · Guided: our engineer attends and your team installs. B · Turnkey: our team installs and commissions. C · Self-install: drawings, video guidance and remote commissioning. Read the details.
Will the equipment work with my local power supply?
Tell us your country and the power supply on site. Pumps, heaters and controls are specified for it and confirmed in the quotation.
Warranty & service
What warranty do I get?
Stainless steel shell: 5 years. Buried pipework: 3 years. Equipment: 2 years. Wellness equipment: 1 year. Wear parts: 3 months. The warranty starts when commissioning is signed off.
What if something breaks far from China?
We solve most issues remotely, by video call and remote access to the control system. Standard spare parts ship within 15 working days, custom parts within 45, and key parts stay available for 8 years. On-site visits are arranged as your contract states.
Which language do you work in?
English and Chinese. Manuals are supplied in English.
Privacy notice
How STAVSJÖ uses the details you give us. Plain language, no small print.
Who we are
This website is run by Beijing Yuanwang Hot Spring Design Group, which sells STAVSJÖ products. Questions about your data: .
What we collect
Only what you send us: your name, email, phone or WhatsApp number, company, country and project details. When you press “Send request”, the quote form delivers your details to our inbox through Formspree, a form-delivery service that processes them on our behalf. If you choose WhatsApp, the form prepares a message that you send yourself, and a copy of the form goes to our inbox the same way.
Why we use it
To answer your enquiry, prepare a quotation and, if you buy, to deliver and support your project. We do not sell your details and do not add you to mailing lists without asking.
How long we keep it
Enquiry messages are kept for as long as needed to follow up your project, and contract records as long as the law and the warranty require.
Cookies
Strictly necessary storage remembers your cookie choice. Analytics and marketing cookies are only used if you allow them. Change your choice at any time: .
Your rights
You can ask to see, correct or delete the personal data we hold about you, or object to its use. Email us and we will reply within 30 days. If you are in the UK or EU you can also complain to your data protection authority.
Let us quote
your project.
Tell us the size, shape, steel grade and finish. We build to your exact specification — at factory price.
- All products are custom made to order
- Hotels, resorts and commercial projects welcome
- Photos or drawings help us price faster
- Reply within 1 working day


