Factory-direct prices · No middlemen · Free quote in 1 working day
Stainless steel · Factory-direct

Pools, spas & saunas.
Factory price.

Made to order in our own factory and sold direct to hotels, resorts and homes.

Live 3D · drag to look around
2002Water treatment since
100+Hot spring, spa & pool projects
50+Designers & engineers
1666Stavsjö, Sweden — our heritage
Best sellers

Made in our factory.
Priced from it.

Every model is built to your size, shape and finish. Tap a product for its factory price.

Factory-directNo importer, distributor or showroom mark-up
Made to orderAny size, shape, grade and finish
Welded shellNo waterproof layer to fail — 304 / 316L steel
Quote in 1 daySend a size or a sketch
All collections

Seven ways
into the water.

Design yours in 3D →
Complete systems

Everything
behind the water.

Featured projects

Built for resorts
people return to.

All projects →
Fibre-laser cutting line in our factoryOur factory · Beijing
Inside our factory

No middlemen.
Just our workshop.

Laser cutting, CNC bending, TIG welding and polishing under one roof — the same team that designs your pool cuts its first sheet. That is why our price is a factory price.

Bending hall
Laser cell
Factory campus
How we work

From first sketch
to first guest.

One contract, one team, one point of contact — from the water analysis to the after-sales service desk.

  1. 01Brief & water testYour site, use and source-water report decide the design and the steel grade.
  2. 02Design & drawingsConcept, 3D model and engineering drawings for your approval.
  3. 03Factory buildCut, formed, welded, polished and pressure-tested in our own workshop.
  4. 04Install & commissionGuided or turnkey installation, five commissioning records, operator training.
  5. 05After-salesP1–P4 response times, spare parts in 15 working days, 8-year parts availability.
From Beijing to your site

Made in one factory.
Working worldwide.

One factory, one team, delivering to hotels, resorts and homes wherever the water is.

  • BeijingFactory & head office
  • SwedenStavsjö hot spring hotel, since 2009
  • CanadaProject delivered
  • USAProject in progress
  • New ZealandProject in progress
Home / Projects / Design portfolio

Design portfolio

Our design team plans the whole bathing experience — master plan, landscape, interiors, pools and the equipment behind them. Renderings from recent design proposals.

Design + build

Designed by us.
Built by us.

The pools, spas and plant rooms in our designs come from our own factory — so the drawing you approve is the product you receive.

Hillside villa with infinity pool
Home / Projects

Projects

Hot springs, hotels and resorts — from the plant room to the pool hall. Real footage and photographs from our sites.

Project overview

Seven projects,
one standard.

Wellness hotels, resort towns, rooftop terraces and show venues across China — each with the scale, location and our scope set out below.

Case 01 · Featured project · Project film

Linhai Yitang Wellness Hotel,
Arxan, Inner Mongolia

A five-star wellness hotel in the primeval forest of the Greater Khingan mountains. Its domed hot spring hall has a curved acrylic-walled pool and hydromassage loungers — and behind the walls, a complete water treatment plant room, built and commissioned by our team. The hotel also has sauna and salt-wall rooms.

ProjectArxan Linhai Yitang Wellness Hotel
LocationPhase II, Dongguli Xuecun, Wenquan Subdistrict, Arxan, Hinggan League, Inner Mongolia
Resort156 five-star wellness rooms · 16 private hot spring courtyards · 4,200 m² hot spring pools incl. a suspended transparent swimming lane and 11 outdoor pools · banquet hall · yurt restaurant · health management centre
TypeIndoor hot spring hall and plant room
Our scopeWater treatment plant room (filtration, pumps, pipework) · on-site welding · curved acrylic pool walls with stainless channel · hydromassage loungers and neck-massage spouts · PLC control cabinet · commissioning
Site footage
Energy centres · geothermal plant rooms

Hot spring water,
used step by step.

Spring water arrives at 60–70 °C. We use it in stages — domestic hot water, pool heating, floor heating, then heat pumps — before it is returned or reused, cutting heating cost by about half.

Selected references

Trusted since 2002.

More than 100 completed or ongoing hot spring, spa and pool projects. More case studies are being added.

Jinyu Badaling Hot Spring ResortYanqing, Beijing · Hotel for the 2022 Winter Olympics · energy centre
Arxan Linhai Yitang Wellness HotelInner Mongolia · 156 rooms · opened August 2026
Gubei Water Town (Simatai)Miyun, Beijing · 9 km² resort · hot spring and spa water systems
Beijing ValleyChengde, Hebei · PowerChina wellness & hot spring resort
Manxin Mansion, Water Great WallHuairou, Beijing · private hot spring courtyards
Langya Ancient City Water ShowLinyi, Shandong · water show venue
Ruilinwan Hot Spring HotelBeijing · Hot spring hotel
Siji NanheChangchun · 24,000 m² hot spring zone · stainless spa pools
STAVSJÖ HotelNyköping, Sweden · Ground-source heating system
InternationalProjects in Canada, New Zealand and the USA
We have worked for · 服务企业

Gubei Water Town · Jiuhua Resort · BBMG Jinyu · Wanda · Sunac · Evergrande · Fosun · Tongrentang · Nangong Hot Spring Water World — and long-term partner to Wanda Culture & Tourism, Wanda Hotels, Fosun Tourism, Sunac Culture & Tourism, Evergrande Children's World and OCT.

Complete project list · 项目案例

Seventy projects
and counting.

Hot spring hotels, geothermal energy systems, spas, pools, water parks and water features across China and in Sweden. Search or filter the list.

Size—
Capacity—
Detail—
Drag · scroll / pinch to zoom
Home / Engineering / Factory & Engineering

Factory & Engineering

Real photographs from our workshop and our sites — how a STAVSJÖ pool is drawn, built, delivered and installed.

00 · Our factory

Laser, press brake,
one roof.

Our production campus in Beijing: a fibre-laser cutting line with its own chiller and compressed-air supply, a bending hall of CNC press brakes and shears, and an automatic-control workshop where control cabinets and stainless enclosures are built and wired.

LaserCNC fibre-laser cutting for clean, accurate edges
CNC bendingPress brakes and shears for long stainless panels
TIGArgon-arc welding with matched ER308L / ER316L filler
In-houseDesign, fabrication and installation by one team
01 · Fabrication

Built in one piece,
in our own hall.

Panels are cut, formed and TIG-welded on reinforcing frames, then ground, polished and pressure-tested before they leave. See Technology & Materials for the six fabrication steps.

From sheet to spa · step by step

Fourteen steps,
one team.

The same people draw, cut, roll, weld, polish, pack and install. Photographs and clips from recent production in our workshop and on site.

Workshop footage
02 · Engineering drawings

Every pool
is drawn first.

Skimmer or overflow, straight or curved, sunken or rooftop — each project is modelled and detailed before cutting starts. You approve the drawing; we build to it.

03 · Finished details

Where quality
shows.

Overflow gratings, channels, steps and rails — the parts guests touch every day, photographed on finished pools.

04 · Delivery & installation

Lifted in.
Not poured.

Because the shell arrives finished, site work is short: a prepared base or pit, a crane, connections and commissioning.

05 · Refurbishment

Give an old pool
a steel life.

A leaking concrete pool does not always need demolition. A welded stainless lining can be installed inside the existing structure, ending the cycle of re-tiling and re-waterproofing.

06 · Water treatment

The plant room
comes with it.

Filtration, dosing, heating and controls are designed with the pool — as a plant room, an underground shaft or a compact equipment wall — using equipment from ISO-certified suppliers.

Compact equipment wall beside a pool
Home / Engineering / Hot Spring Technology

Hot spring
technology

Twenty years of geothermal water treatment, cascade heating, dehumidification, immersive spa rooms and smart control — from our technical manual, with every diagram in English and Chinese.

温泉核心技术 · 中英文对照

01 · Geothermal water treatment · 地热水处理

From the well
to the pool.

Spring water straight from the well often carries sand, iron, manganese, hydrogen sulphide, fluoride or arsenic. Each is removed in its own stage before the water reaches a bather.

    Raw water · 原水水处理工艺

    Five problem substances,
    five methods.

    Method chosen from the source-water analysis of each well.

    02 · Medical mineral water · 医疗矿泉水水质标准

    When is spring water
    medicinal?

    Thresholds in mg/L (radon in Bq/L) at which a component has medical value, and at which the water may be named after it.

    Reference values as summarised in our technical manual; the applicable standard is confirmed for each project.

    03 · Pool circulation · 循环水处理工艺流程

    A loop that
    never stops.

    Every pool runs its own circulation: strained, pumped, filtered, heated and disinfected, then returned — around the clock.

      Circulation equipment · 循环水处理设备
      04 · Plant rooms · 水处理机房施工实景

      Behind the walls
      of a hot spring.

      Water treatment plant rooms built by our installation teams: filter batteries, balance tanks, pump sets and pipework — photographed during construction.

      05 · Cascade use of spring water · 温泉水梯级利用

      One well,
      four temperatures.

      Spring water gives its heat in steps — hottest uses first, then cooler ones, and finally water-source heat pumps — before it is reinjected at 20 °C or below.

      Worked example · 节能收益测算

      One hotel, three wells,
      RMB 8.76 million a year.

      From the energy analysis for a hotel project with three geothermal wells. Well 3 delivers 33 °C water at 80 t/h. Using it for about 300 t a day of domestic hot water, instead of heating mains water from 13 °C, saves:

      Heat saved per day6,978 kWh300 t × 4.187 × (33 − 13) ÷ 3.6
      Natural gas avoided821 m³ / dayboiler efficiency 0.85 · 10 kWh/m³
      Well 3 savingRMB 958,905 / yrat RMB 3.2 per m³
      All three wells, full cascadeRMB 8,762,952 / yrwells 1 & 2: RMB 7.80 M · well 3: RMB 0.96 M
      Engineering drawings · 工程图纸(中英对照)
      How a water-source heat pump works · 水源热泵原理
      It lifts low-grade heat from shallow groundwater or spent spring water to useful temperatures with a small input of electricity. In heating mode the refrigerant releases heat to the building's heating water in the condenser and picks up heat from the source water in the evaporator; in cooling mode the cycle is reversed and the heat goes into the source water.
      06 · Geothermal-driven liquid-desiccant dehumidification · 热驱动溶液除湿热泵

      Dry air,
      driven by spring water.

      Pool halls are humid. A liquid-desiccant heat pump removes moisture and odours without over-cooling and reheating the air, and its solution is regenerated with geothermal hot water — no other energy needed.

      7–8 g/kgCondensing dehumidification · 冷冻除湿 — lowest moisture content
      3–4 g/kgLiquid desiccant · 溶液除湿 — lowest moisture content
      ≈ 0 g/kgDesiccant wheel · 转轮除湿 — lowest moisture content
      No reheatNo over-cooling, no reheating — lower energy and running cost
      07 · Light-and-shadow spa · 光影温泉水疗 · 暴风雨水疗房

      Bathe inside
      a storm.

      A turnkey immersive spa room: four LED walls, real rain and wind, lightning and wave jets, all running to the film's timeline. Below, the specification of a public-area room from our manual.

      One-stop storm-rain spa room · 一站式构建暴风雨水疗房

      Room specification · 空间功能布置
      Custom high-refresh LED · 定制款 LED 高刷屏
      Planning notes · 项目实施建议
      Size the plant room to the equipment, and never place equipment above pool level. Leave at least 50 cm around the pool for the LED frame and ventilation. Building drainage and the ceiling finish are by others; detailed pipework drawings follow once the scheme is approved.
      08 · Smart hot spring management · 地热温泉智能管理系统

      Every pool,
      on one screen.

      Manual pool checks, valve turning and paper logs are slow and costly. Our system monitors and controls supply, pools and plant rooms through sensors and IoT, guides visitor flow, raises alarms and analyses energy use.

      Measured · 数据采集
        Controlled · 设备控制
          Built and wired by us

          Our own
          control workshop.

          Control cabinets and stainless enclosures for these systems are assembled, wired and tested in our automatic-control factory before they go to site.

          Control cabinet workshop
          Home / Engineering / Quality & Supply Chain

          Quality & Supply Chain

          How we check our own work — and the certified manufacturers and distributors behind the equipment in our systems.

          Our checks

          Inspected before
          it ships.

          MaterialsMill certificates checked for every batch of stainless steel; grade confirmed against the water analysis (SUS 304 or 316 / 316L).
          WeldsVisual inspection and dye-penetrant testing; radiographic or ultrasonic testing on critical joints.
          SurfaceGround, polished and passivated after welding.
          DimensionsVerified against the approved drawing before dispatch.
          On siteFive commissioning records, ending with a signed acceptance and water quality report.
          Patents · 专利证书

          Our own
          inventions.

          Utility-model patents held by Yuanwang group companies, covering hot spring pools, water treatment, hydrotherapy, heating and sweat-steam rooms.

            Qualifications & honours · 资质与荣誉

            Recognised
            by the industry.

            Certificates held by Yuanwang group companies. Shown as issued; current validity and full copies are available on request.

            Certified supply chain

            Equipment from
            certified sources.

            Water treatment equipment in our systems is sourced from manufacturers and distributors holding the management-system certificates below.

            The certificates shown are held by the companies named on them — not by STAVSJÖ or Yuanwang. They are shown to document our supply chain. Certificate details can be verified with the issuing bodies (TÜV Rheinland, LRQA) or on the CNCA website.
            Component partners

            Everything around
            the steel.

            We build the steel ourselves and work with specialist manufacturers for finishes, lighting, fittings, displays and electronics — so one order covers the whole installation.

            Photographs show partner products and samples. Availability, specifications and lead times are confirmed in the quotation.

            Home / Technology

            Built once.
            No leaks. No cracks.

            How a STAVSJÖ pool is made — and why a welded steel shell outlasts concrete and tile.

            0Separate waterproof layers that can fail
            304 / 316LFood-grade stainless steel
            30+ yearsExpected life of the corrosion-resistant structure
            50%+Shorter build time than conventional construction
            The principle

            The shell is the waterproofing.

            Concrete pools rely on a coating or membrane to hold water. Over time it ages and cracks, and a leak usually means breaking out tiles and closing the pool. A STAVSJÖ pool is one fully welded stainless steel vessel: between the water and the structure there is only metal. The non-porous surface does not hold dirt or colour, which cuts chemical use and cleaning time.

            Fabrication

            Six steps in our factory.

            01

            Water first

            We test before we design. Chlorides, temperature and treatment chemicals decide the steel grade. For aggressive spring water we offer a steel structure with a dedicated liner.

            02

            Precision cutting

            Plates are cut by CNC laser or plasma for accurate, clean edges, which are then chamfered.

            03

            Forming

            Hydraulic press brakes and rollers shape each panel, with bend radii of at least 1.5 × plate thickness to avoid stress cracks.

            04

            TIG welding

            Full argon-arc welding with matched ER308L / ER316L filler, worked in staged sequences to control distortion. Reinforcing ribs are spaced at no more than 800 mm.

            05

            Finishing

            Welds are ground and the surface polished in stages (80 / 120 / 240 grit) to a brushed, mirror or matte finish, then passivated.

            06

            Inspection

            Material certificates checked; welds inspected visually and by dye-penetrant test, with radiographic or ultrasonic testing on critical joints; dimensions verified before dispatch.

            Design parameters

            Measured,
            not assumed.

            Key parameters from our technical method statement for stainless steel spa pools, and how each one is checked.

            ParameterRequirementChecked by
            MaterialSUS 304 / 316L, nickel ≥ 8%Spectral analysis
            Plate thicknessShell ≥ 1.2 mm (1.5–2.0 mm for large pools); stiffeners ≥ 2.0 mmUltrasonic thickness gauge
            SurfaceRoughness Ra ≤ 3.2 μmRoughness tester
            StiffnessRibs at ≤ 800 mm; deflection < 3 mm when fullLoad test
            CorrosionNo rust after 800 h salt-spray testSalt-spray chamber
            Base slabConcrete ≥ C20, ≥ 150 mm, flatness ≤ 3 mm/mTest cubes, level
            Setting outLevel within 3 mm/mLaser level
            Water-tightnessFilled 24 h (48 h above 100 m³), then observed 24 h: no leaks, level drop ≤ 2 mmClosed-water test
            CuttingLength / width ±1 mm; diagonal ±1.5 mmTape, square
            Rolled curvesRadius within ±2%; roundness ≤ 0.5% of diameter, max 5 mmTemplate, gauge
            Fit to siteKey parts within 3 mm of site measurements; at least 10% trial-fitted, 100% of key partsSite survey, trial fit

            Design references include GB 50015 (water supply & drainage design), GB 50268 and GB 50235 (pipework construction and acceptance). Project-specific values are confirmed in the quotation.

            Smart controls

            Runs itself.
            Reports to you.

            Our control logic for spas, pools and plant rooms runs on PLC controllers with a touch screen on site, a phone app and remote alarms. Typical set-points below; each project is tuned to its water and use.

            Comparison

            Steel, concrete or acrylic?

            STAVSJÖ stainless steelConcrete + tilesAcrylic shell
            Initial costHigherLow material cost, high labourLow
            Build timeFactory pre-made, fast installPour, cure, waterproof, tile — about 40–60 days to testingFastest — ready-made shell
            WaterproofingFully welded shell, nothing to failCoating or membrane that ages and cracksOne-piece shell
            Yearly upkeepLow — rinse, check weldsMedium–high — grout, re-waterproofing, patchingLow — but scratches hold dirt
            Major repairLong structural life; a liner, where fitted, can be replaced without removing the structureWaterproofing needs attention after about 5–10 years; leaks mean breaking outHard to refurbish; usually replaced
            End of lifeSteel is recyclableDemolition wasteReplacement

            Over about ten years the total cost of a stainless pool is typically no higher than concrete, because repair and closure costs are avoided.

            Best value

            SUS 304

            The standard choice for tap water and typical hot spring water — the balanced starting point for most projects.

            Coastal · sulphur

            SUS 316 / 316L

            Stronger resistance to chlorides and sulphides, for seaside sites, high-chlorine water, sulphur springs and heavy commercial use. About 20–30% higher material cost than 304.

            Home / After-Sales Service

            After-Sales Service Policy

            For overseas customers in the EU / EEA and Great Britain. A summary of how we respond, what we cover and what we ask of you.

            Document YW-AFS-2026-01Version 1.0Effective 8 November 2026Issued by Beijing Yuanwang Hot Spring Design
            i.

            We promise a response

            Someone answers, someone diagnoses, someone gives you the next step. We do not promise a result before we have seen the facts.

            ii.

            We promise to come — as agreed

            A visit from China to Europe takes time. The number of on-site visits and who pays for travel are written into your contract.

            iii.

            Inside the boundary, it is ours

            Material, workmanship or design defects that existed when the goods left the factory are our responsibility.

            Section 1

            Response times

            Times run from the moment we receive complete information. “First response” means we have confirmed receipt and assigned an engineer. “Target” is the time to a technical judgement or plan; it does not include shipping or visa time.

            LevelSituationFirst responseTarget
            P1 UrgentSystem fully stopped, leak or flooding, electrical risk, safety affectedWithin 2 hours (working hours)
            Within 8 hours (out of hours)
            Temporary measures within 24 hours
            P2 MajorMain function lost but partly running — e.g. one pump down, temperature control fault, water quality out of rangeWithin 8 hoursSolution within 3 working days
            P3 NormalLocal fault, parameter drift, appearance issueWithin 2 working daysPlan within 7 working days
            P4 EnquiryHow-to questions, spare-part prices, documentsWithin 3 working daysHandled as an enquiry
            Section 2

            Warranty

            Standard recommended periods, counted from handover and acceptance at the project site. The periods in your contract apply; extended warranty can be agreed separately.

            Component / systemPeriodNotes
            Pool shell waterproofing & lining system5 yearsParts supplied and installed by Yuanwang; excludes civil structure
            Buried pipework & water distribution3 yearsExcludes external damage, frost heave, settlement
            Heat exchangers2 yearsScaling or corrosion from out-of-spec water is not covered
            Yuanwang-brand equipment — pumps, filters, dosing units, control cabinets2 yearsExcludes wear parts
            Heat pumps & geothermal wellhead equipment2 yearsAnnual maintenance required
            Wellness & hydrotherapy equipment1 yearHigh-frequency commercial use
            Third-party equipment — valves, instruments, invertersMaker's termsWe assist with the claim to the original maker
            Wear parts — seals, O-rings, filter elements, nozzles, lamp covers3 monthsNormal consumables

            Covered: faults and under-performance caused by material, workmanship or design, under normal use and normal maintenance.

            Not covered:

            • Installation, operation or maintenance not following the manual
            • Water quality outside the agreed design conditions
            • Missed scheduled maintenance — the warranty period is then halved
            • Damage, misuse or unauthorised modification
            • Force majeure
            • Normal wear and natural change in appearance
            Section 3

            Installation, commissioning & training

            Most “after-sales problems” overseas begin at installation. We treat commissioning as the first step of after-sales, and your contract names one of three installation modes.

            ModeWhat happensBest for
            A · Guided installationOur engineer attends; your team installs; we guide, confirm key steps and commissionRecommended — best value
            B · Turnkey installationOur team installs and commissionsComplex systems, no local crew
            C · Self-install + remote commissioningWe provide drawings, video guidance and remote commissioning; you send photo recordsSimple systems, experienced clients

            Five records are always kept — they are the basis for any later question of responsibility:

            1. Unpacking inspection — appearance, quantity, nameplate data
            2. Pipe flushing and pressure test
            3. Electrical wiring check and insulation test
            4. First filling and first-run parameters
            5. Commissioning acceptance, including a water quality report

            Training: one on-site session of 2–3 working days for your operating staff, covering daily operation, backwashing, dosing, settings and common faults. Operation and maintenance manuals are supplied in English (electronic).

            The warranty period starts on the date step 5 is completed and signed by both parties.
            Section 4

            Remote first, on-site as agreed

            If it can be solved remotely, we do not send an engineer — a remote answer in 24 hours is better than a visit in a month. Remote diagnosis uses video calls, authorised temporary access to the control system, site photos to our checklist, and operating data.

            On-site visitsWhat to expect
            Lead timeUsually 15–30 calendar days from confirmation to arrival, including visa and travel
            Duration5–10 working days recommended per visit
            CostWithin warranty: engineer day-rate waived; travel shared as the contract states. Outside warranty: paid by the buyer
            Number of visitsWritten into the contract; extra visits are charged per visit
            If we cannot attendRemote diagnosis plus a local service company working under our technical guidance
            Section 5

            Spare parts

            • Standard parts — seals, filter elements, nozzles, diaphragms, common electrical parts: shipped within 15 working days of order.
            • Non-standard and custom parts: shipped within 45 working days, as quoted.
            • After a model is discontinued: key parts remain available for 8 years.
            • Quotation: price, lead time and shipping method within 2 working days of your parts order.

            We recommend ordering a first-year spare-parts kit with your equipment. A seal worth under 1% of the equipment price can otherwise stop a system for a month.

            Section 6

            Maintenance schedule

            Standard operating conditions. Scheduled maintenance keeps your warranty at full length.

            IntervalTasks
            DailyCheck flow, pressure, temperature, chlorine / ORP and pH; look for noise, leaks and alarms
            WeeklyBackwash filters; check dosing levels and rates; check pump vibration and temperature
            MonthlyFull water analysis; clean the control cabinet; re-tighten fasteners
            QuarterlyCheck heat-exchanger and pump efficiency; test safety valves
            Half-yearlyElectrical insulation test; back up inverter settings; calibrate sensors
            YearlyFull system overhaul; assess seals and wear parts; annual system health report
            Section 7

            Claims

            Please notify us of a defect within 30 days of finding it, and no later than two years after delivery. We give a written finding within 30 working days of receiving complete documents.

            Value / impactHow it is handled
            Under €500You may fix it first and claim with photos and invoice — no prior approval (up to twice a year)
            €500 – €5,000Remote diagnosis and finding of responsibility; reply usually within 10 working days
            Over €5,000 or safety-relatedDedicated team, on site if needed
            Section 8

            Raising a service request

            Service requests go through the service desk named in your contract, so that every request is numbered and tracked. To start the clock, please include:

            • Equipment serial number
            • What is happening, and since when
            • What has already been tried
            • Photos or video
            • Current operating values — flow, pressure, temperature, current
            • Latest water test record
            This page is a summary for information. Regulations and terms can change; if anything here differs from your signed contract, the contract applies. The full policy document is available on request.
            Home / About

            Born at a Swedish spa.

            STAVSJÖ is the stainless steel pool, spa and sauna brand of Beijing Yuanwang Hot Spring Design Group.

            The name

            Stavsjö,
            since 1666.

            STAVSJÖ crowned deer emblem

            The crowned deer of Stavsjö — a royal retreat south of Stockholm, and the emblem of our brand.

            The Stavsjö hot spring hotel stands south of Stockholm. Founded in 1666, it was once a royal retreat and is known today for its spa. In 2009 our group became its largest shareholder, taking on its operation and its technical and brand development.

            That is where the name comes from — and the standard. We bring Nordic spa thinking to every pool we build in our own factory in China, and sell it to you directly.

            2002Beijing Yuanwang Liye Leisure Equipment founded — water treatment for geothermal water, hot springs and pools.
            2006Beijing Yuanwang BaiLi Landscape Architecture Design founded — hot spring towns, hotels, spas and pools.
            2009Largest shareholder of the Stavsjö hot spring hotel, Sweden.
            TodayOver 100 completed or ongoing projects. A design team of more than 50. Utility-model patents covering bathing pools, water treatment and hydrotherapy.
            The company

            Beijing
            Yuanwang

            Where we are

            Office in the city.
            Factory on the edge.

            Factory campus, Beijing
            Factory

            Production campus

            Laser cutting, bending, welding and polishing. Visits by appointment — we are happy to show customers round.

            Chaoyang · Beijing
            Head office

            Design & sales

            • Office email
            • Phone · WeChat · WeChat
            • WhatsApp
            Settings

            Where our work lives.

            Hot spring, spa and pool settings from our archive. Detailed case studies are coming soon.

            Home / FAQ

            Buying from overseas,
            made simple.

            What international buyers ask us most — prices, lead times, shipping, installation and warranty. If your question is not here, ask us on WhatsApp.

            How an overseas order works

            Four steps,
            one contact.

            You deal with one person from the first message to commissioning — no agents, no hand-offs.

            1. 01Send your briefA size, a sketch or a photo of the site. WhatsApp or email.Day 1
            2. 02Quote & drawingsFactory price, specification and drawings for your approval.From 1 working day
            3. 03Build & inspectMade in our Beijing factory, inspected and documented before it leaves.Confirmed in your quote
            4. 04Deliver & commissionGuided, turnkey or remote installation, then after-sales support.Modes A · B · C

            Prices & quotes

            Why are you cheaper than European brands?

            We design, cut, weld and polish in our own factory and sell to you directly. There is no importer, distributor or showroom in between, so you pay the factory price for the same stainless steel grades.

            How do I get a price?

            Send us a size, a sketch or a photo of your site through the quote form, WhatsApp or email. We reply within 1 working day. Drawings and photos help us price faster and more accurately.

            Do you sell to my country?

            Yes. We work with clients in any country. Our group has projects in China and Sweden and has delivered or is delivering projects in Canada, New Zealand and the USA.

            Can I order a single unit?

            Yes. Every product is made to order, so one hot tub for a private villa is as welcome as a full hotel spa.

            Products & materials

            304 or 316L stainless steel — which do I need?

            SUS 304 suits most fresh-water pools and hot tubs. For mineral hot spring water, salt water or coastal sites we usually recommend 316L. Send us your source-water report and we will advise. Every shell uses steel with nickel content of at least 8%.

            Can you build to my exact size and shape?

            Yes. Size, shape, depth, finish, jets and lighting are all made to your specification. Try shapes and finishes in our 3D Design Studio, then send us a screenshot.

            How do you check quality?

            Welded shells are TIG-welded, dye-penetrant tested and given a 24-hour water-tightness test. See Quality & Supply Chain for the full list of checks.

            Are the pictures on this site real?

            Most photographs come from our factory and our projects. Some images are design renderings, and they are labelled. Final specifications always follow the approved drawings.

            Can I visit the factory?

            Yes, by appointment. We are happy to show customers round the production campus in Beijing, or give you a live video tour.

            Shipping & installation

            How long does production take?

            It depends on the size, finish and equipment. Your quotation states the production time and delivery schedule before you order.

            How is it shipped?

            Products are packed for export in our factory. The delivery terms — to your nearest port or to your site — are agreed and written into your quotation.

            Who installs it?

            You choose one of three modes. A · Guided: our engineer attends and your team installs. B · Turnkey: our team installs and commissions. C · Self-install: drawings, video guidance and remote commissioning. Read the details.

            Will the equipment work with my local power supply?

            Tell us your country and the power supply on site. Pumps, heaters and controls are specified for it and confirmed in the quotation.

            Warranty & service

            What warranty do I get?

            Stainless steel shell: 5 years. Buried pipework: 3 years. Equipment: 2 years. Wellness equipment: 1 year. Wear parts: 3 months. The warranty starts when commissioning is signed off.

            What if something breaks far from China?

            We solve most issues remotely, by video call and remote access to the control system. Standard spare parts ship within 15 working days, custom parts within 45, and key parts stay available for 8 years. On-site visits are arranged as your contract states.

            Which language do you work in?

            English and Chinese. Manuals are supplied in English.

            Home / Privacy

            Privacy notice

            How STAVSJÖ uses the details you give us. Plain language, no small print.

            Updated Nov 2026
            Free quote

            Let us quote
            your project.

            Tell us the size, shape, steel grade and finish. We build to your exact specification — at factory price.

            • All products are custom made to order
            • Hotels, resorts and commercial projects welcome
            • Photos or drawings help us price faster
            • Reply within 1 working day

            Get your factory price

            Fields marked * are required.

            Almost done

            
                    
            Open
            WhatsApp